Q1 | Does the DC mode of the AC power supply have the constant current (CC) output of the DC power supply? |
The DC mode of the AC power supply does not have the constant current (CC) output of the DC power supply.
The DC mode of the AC power supply can only provide a constant voltage (CV) output. When the DC power supply is overloaded, it will become a constant current (CC) output. When the DC mode of the AC power supply is overloaded, the output will stop.
Q2 | Can PEL-3211 booster be connected in parallel with PEL-3021(175W) or PEL-3041(350W)? |
PEL-3211 booster can only be connected in parallel with PEL-3111.
Five PEL-3111 units can be connected in parallel or PEL-3111 can be combined with PEL-3211*4
A maximum of five electronic loads of the same type as PEL-3021 or PEL-3041 can be connected in parallel.
Five PEL-3021 units can be connected in parallel
Five PEL-3041 units can be connected in parallel
The same is true for H series high pressure models
Application keyword: parallel connection of electronic loads
Q3 | How do you verify fuses and circuit breakers with the most appropriate cost? |
Test fuses and circuit breakers need transient current to test whether the operation is normal.
It is a design issue when it does not disconnect as the function
It is a quality issue when it does not connect as the function
GW Instek electronic loads with the Turbo mode can help users to verify these two issues at the most appropriate cost.
Turbo mode can provide double the rated current or power in a short time (1 second).
Electronic loads with the Turbo mode include:
AEL-5000系列GW Instek brand: The AEL-5000 series
3310G系列,3350G系列,3270系列,3282系列Prodigit brand: the 3310G series, the 3350G series, the 3270 series, the 3282 series
Other applications of Turbo mode: Short circuit of AC power supply, OCP, OPP test
Q4 | How do you eliminate the voltage drop caused by the wiring of the power supply? The application of output Remote Sense |
Connecting the power supply to the device under test (DUT or DUC) requires an additional test lead, and the resistance of the test lead will cause a slight voltage drop, so that the DUT cannot get the expected output voltage. In order to improve this problem, the power supply is designed with the function of Remote Sense. The remote sense function senses the actual voltage value received by the DUT through the additional wiring of S+ and S-.
Take the 3.3V output as an example, because the voltage drop of the wire, there is only 3.2V left on the circuit under test. Through the report of the remote sense, the power supply will increase the output until the voltage reported by the remote sense is 3.3V, this design can eliminate the voltage drop of the wire.
Precautions on using Remote Sense:
Q5 | Precautions for testing HVDC server power supply (ODCC) or LVDC communication power supply? |
Mission Critical applications such as communication equipment rooms (such as 4G, 5G base stations) and data centers (IDC) will have a great impact due to power failure. Therefore, such constructions will have emergency power supplies such as UPS. In order to save energy, these data centers also desire to directly use regenerative energy or the DC voltage of the UPS to reduce the consumption of the conversion.
Therefore, in addition to AC input, the current power supply also supports 48V DC input LVDC and 180~400V DC input HVDC. When testing this type of power supply, the conventional AC power supply does not have the DC mode, so it is difficult to perform the test.
GW Instek ASR-2000 series and ASR-3000 series AC/DC power supplies are instruments developed for the above applications.
Precautions for purchasing AC and DC power supply:
2. Whether it can be seamlessly converted from AC output to DC output: Most AC/ DC power supplies turn off AC and then turn on DC, so there will be a power outage at the moment of conversion. GW Instek ASR-2000 and ASR-3000 are seamless transition designs.
Q6 | Why is the computer still unable to detect the instrument after installing the Win7 driver of APS-1102A? |
In addition to installing the driver for the APS-1102A, your computer must also have NI-VISA installed.
Q7 | For the APS-7000 series, can the step time of Sequence or Simulation exceed 3600 seconds (1 hour)? |
For the APS-7000 series, single step time of Sequence or Simulation is 3600 seconds (1 hour).
If your application requires a sequence or a simulation step time of more than 1 hour, you can use the Jump function to achieve it.
Q8 | What conditions will the power supply activate over-voltage protection (OVP)? |
The power supply over-voltage protection (OVP) is designed as a DUT protection mechanism to avoid supplying excessive voltage to the device under test (DUT) or circuit under test (DUC).
Three possible overvoltage (OVP) scenarios are provided below.
Scenario 1: Users forget that the overvoltage protection was set for the last project, and the voltage of this test project is higher than the overvoltage protection setting value.
For example: the OVP of the last project was set to 12.5V, the required voltage of this project is 15V, and the set output voltage is higher than the 12.5V of the overvoltage protection, so the power supply starts the protection mechanism to stop the output.
Scenario 2: After connecting the remote compensation, the output of the power supply is higher than the overvoltage protection setting value due to compensation
For example: the working voltage of the circuit is 12V, and the overvoltage protection is set to 12.5V. Due to the excessive loss from wiring, a voltage drop of 0.6V is caused on the wiring, resulting in only 11.4V voltage of the DUT. The power supply starts to compensate, and the compensation reaches 12.5V, the DUT is 11.9V, and the overvoltage setting value of 12.5V is exceeded after compensation, so the power supply starts the protection mechanism to stop the output.
Scenario 3: Due to the inductance of the test lead, at the moment of the power supply switching or the moment of the programmable voltage change, the stray components on the lead cause LC resonance, and the transient voltage during the voltage change exceeds the OVP protection voltage setting value.
Q9 | Fan Fail message appears on the PSU series power supply |
Fan is a component that ensures heat dissipation and ensures the normal operation of the power supply.
The PSU series power supply will stop output when there is a fan fail message.
When the fan is in the critical state of failure, the phenomenon of good and bad sometimes causes the failure prompt of Fan Fail indicator to flash.
When your power supply keeps showing Fan Fail prompt, please contact your nearest GW Instek Service Center services@goodwill.com.tw
Routine maintenance precautions:
Q10 | How do you perform data logging from the measurement function of the ASR series AC/DC power supply? |
The measurement function of the ASR series AC/DC power supply can be performed through the free software to perform data logging (Data Logger)
The software diagram is as follows
Figure 1 Data logging of ASR measurement parameters
Figure 2 Harmonic data logging
For free software, please click the link below, file download option, registered members can download for free after login
https://www.gwinstek.com/en-global/products/detail/ASR-3000
Q11 | PSU 3KW~6KW AC input terminal specifications |
Single phase 220V (B type)
3kW model
Terminal rated voltage and current: 400V, 41A
Locking screw: M4
Locking terminal restrictions: inner diameter greater than 4mm, outer diameter less than 9mm
Part No.: 39BT-00301301 (BLOCK TERMINAL 0168-2303, 300V, 30A ,3P ,RoHS)
4.5kW, 6kW models
Terminal rated voltage and current: 1000V, 76A
Locking screw: M5
Locking terminal restrictions: inner diameter greater than 5mm, outer diameter less than 13mm
Part No.: 39BT-00301401 (BLOCK TERMINAL 0168-4103,600V,115A ,3P ,RoHS)
Three-phase 220V (C type)
4.5W, 6kW models
Terminal rated voltage and current: 1000V, 76A
Locking screw: M5
Locking terminal restrictions: inner diameter greater than 5mm, outer diameter less than 13mm
Part No: 39BT-00401501 (BLOCK TERMINAL 0168-4104, 600V, 115A ,4P ,RoHS)
Three-phase 400V (D type)
4.5W, 6kW models
Terminal rated voltage and current: 1000V, 76A
Locking screw: M5
Locking terminal restrictions: inner diameter greater than 5mm, outer diameter less than 13mm
Part No.: 39BT-00500701 (BLOCK TERMINAL 0168-4105, 600V, 115A ,5P ,RoHS)
For other details, please refer to the link below:
https://paper.dropbox.com/doc/PSU-3KW6KW-AC-input-terminal-specification-rfm3pTQd7P6jo3BDIYBi0
Q12 | What are the requirements for verifying the electronic load of the LED driver? |
The electronic load verifying the LED driver not only has the functions of a general electronic load (CC, CR, CV, CP), but also must be able to simulate the load characteristics of the LED, set the forward bias (Vd) and the on-resistance ( Rd), etc. In addition, the built-in dimming control signal output is convenient for the PWM dimming test of the LED driver.
The dedicated electronic loads that GW Instek supports for LED driver testing are as follows: